Pregunta a un ingeniero
Oct 23, 2026

PTC ASIA 2026 Shanghai Preview: Dates, Exhibits and Visit Planning

Plan your PTC ASIA 2026 visit in Shanghai on November 3–6. Check opening hours, transmission and control exhibits, and practical supplier review questions.

Pregunta a un ingeniero Solicitar un presupuesto
Fluid power and transmission components in a modern industrial exhibition hall.

PTC ASIA 2026 is scheduled for November 3–6 at the Shanghai New International Expo Center. For engineers and buyers working with hydraulic equipment, the exhibition offers a way to investigate components alongside the mechanical and electrical technologies connected to them. The useful question is which suppliers can explain how their products would fit a specific machine, duty cycle and purchasing requirement. This preview covers the confirmed schedule, the exhibition's scope and practical ways to prepare for those conversations. Treat the visit as an opportunity to collect comparable information and identify questions for later engineering review. Check the organizer's current notices again before travelling; the final exhibition day has shorter opening hours. Official event information.

Índice
  1. What is PTC ASIA?
  2. Dates, venue and opening hours
  3. Which exhibits deserve an engineer’s attention?
  4. Prepare a useful supplier conversation
  5. A practical visit plan
  6. Turn exhibition notes into a shortlist
  7. Preguntas frecuentes

What is PTC ASIA?

PTC ASIA is a power transmission and control exhibition. Its Chinese name is 亚洲国际动力传动与控制技术展览会. The official scope brings together fluid power, mechanical transmission, bearings and related components, and electrical drive technologies. That makes it relevant to people selecting individual parts and to teams assembling a complete motion or power system. Official exhibition overview.

The organizer page lists Hannover Milano Fairs Shanghai Ltd., the China Hydraulics Pneumatics & Seals Association, and the China General Machine Components Industry Association. Official organizer information.

For a hydraulic engineer, the wider scope is useful because a pump selection also raises questions about its drive, mounting and control. A cylinder discussion may lead to seals, guidance and measurement. Prepare those connections before visiting, using this guide to selecting a pump, valve and cylinder as a system.

Dates, venue and opening hours

ArtículoConfirmed information
DatesNovember 3–6, 2026
VenueShanghai New International Expo Center, SNIEC
AddressNo. 2345 Longyang Road, Pudong New Area, Shanghai
November 3–509:00–17:00
November 609:00–14:00

Times are China Standard Time, UTC+8. The schedule is taken from the official facts and figures page, checked on October 23, 2026.

Put essential meetings earlier in the visit. The shorter final day leaves less room for a long technical discussion, a second supplier visit or collecting missing documents. Confirm the current entrance arrangement and floor plan before deciding the order of meetings.

PTC ASIA 2026 dates and opening hours at SNIEC in Shanghai.
PTC ASIA 2026 dates, SNIEC venue and opening hours in an original editorial event card.

Which exhibits deserve an engineer's attention?

Component groups to explore at PTC ASIA for transmission and control projects.
Fluid power, electric drives, mechanical transmission, bearings and linear-motion topics connected to application requirements.

The official 2026 brochure groups the offering around fluid power, electric motors, bearings and linear motion, and mechanical transmission with supporting manufacturing capabilities. These are exhibition categories; a particular company's attendance and booth must be checked separately. Official 2026 brochure.

Use the following connections to organize your own enquiries:

  • Pumps, valves and actuators: ask how the proposed combination addresses your operating sequence. Record which conditions the supplier has assumed.
  • Seals and related parts: discuss the working medium, motion, temperature and installation arrangement. A material name alone does not define a complete sealing solution.
  • Motors and drives: ask who will confirm the mechanical interface and control responsibility between the drive supplier and hydraulic supplier.
  • Transmission and support components: when comparing gears, couplings or bearings, ask for the relevant installation and operating requirements.
  • Measurement and monitoring: identify what a displayed value means, where it is measured and what information would be available to your control system.

These are editorial review topics, not an announced seminar programme. For background before a seal discussion, read hydraulic cylinder seals and their different functions.

Prepare a useful supplier conversation

Bring a brief application description that can be shared with exhibitors. It should state the task, movement sequence, loads or output requirements, operating environment, available space and intended quantity. Mark unknowns explicitly. This is more useful than requesting an equivalent component from a photograph.

A compact question sheet helps engineering and purchasing colleagues collect the same information:

DiscussionAsk for
Operating conditionsThe conditions used for the supplier's selection
InterfacesDrawings and details of mounting, connections and controls
EvidenceApplicable data sheets, test reports and stated limitations
Supply scopeAn itemized list of included parts and excluded work
SupportDocumentation, spare parts and the responsible technical contact
Next stepMissing inputs, promised documents and an agreed response date

For example, a team reviewing an alternative pump can take the existing installation drawing and a description of its operating cycle. The discussion should establish what is known about the interface and what still requires calculation or testing. A matching catalogue description is a starting point for review.

Utiliza el hydraulic system specification and RFQ checklist to prepare a consistent information package. Avoid sending different assumptions to each prospective supplier.

Supplier questions covering conditions interfaces evidence and supply scope.
A six-part supplier question sheet covering conditions, interfaces, evidence, supply scope, support and next steps.

A practical visit plan

The sequence below is a suggested working method, not an official exhibition route.

Start with suppliers most relevant to the immediate project. Reserve time for technical questions and record the exact product or revision discussed. Photograph labels or drawings only with permission, and connect each note to the responsible contact.

Next, visit related component categories to resolve interfaces. For example, a seal discussion may reveal a need for additional surface or installation information. Add that question to the project list rather than treating an incomplete answer as acceptance.

Before leaving, review missing documents and arrange follow-up. Separate a general catalogue, a preliminary recommendation and an application-specific proposal in your notes.

For registration, start from the current PTC ASIA official website and select the visitor registration entry. The official registration FAQ describes individual registration and identity verification. International visitors should confirm the accepted identification process with the organizer. Keep the current confirmation and follow its instructions; older registration pages may describe a previous edition.

Suggested workflow from exhibition discussions to an engineering review shortlist.
A suggested workflow from requirements and supplier discussions to written evidence, comparison, engineering review and shortlist.

Turn exhibition notes into a shortlist

A useful shortlist records why a supplier remains under consideration. It should identify the application discussed, proposed product, unresolved interface questions, evidence requested and next action.

Compare responses against the same requirement sheet. If one quotation includes controls or testing and another excludes them, record the difference before comparing totals. Ask for a revised written proposal when the scope changes.

Exhibition participation does not establish suitability for a particular machine. Keep engineering approval, purchasing approval and any required validation as separate steps. The immediate outcome of a good visit is a clearer decision process with fewer unknowns.

Preguntas frecuentes

Is PTC ASIA only a hydraulic exhibition?

Its scope also covers pneumatic, mechanical and electrical transmission technologies. Choose meetings around the interfaces relevant to your project, using the official product categories as a starting point.

Can I spend the whole afternoon there on the final day?

The published closing time on November 6 is 14:00. Plan essential meetings before then and recheck the official schedule before departure.

Should I prepare a complete RFQ before attending?

Bring enough detail to make discussions specific. A preliminary requirement sheet is useful when the design is still developing, provided that assumptions and open questions are visible.

Where should I check registration and programme updates?

Use the official website's current visitor information. Verify the edition year, and confirm any meeting or activity directly before building it into your itinerary.

Artículos relacionados

¿Necesitas ayuda para aplicar estos conocimientos de hidráulica?

Envíanos tus planos, fotos, la presión de funcionamiento, los datos del equipo o cualquier duda sobre la aplicación.

Pregunta a un ingeniero Solicitar un presupuesto